Hills M2 Motorway Upgrade

HILLS M2 MOTORWAY UPGRADE As the preferred subcontractor selected by Leighton Contractors, Online Concrete Cutting Services were engaged to perform a large quantity of concrete sawing and core drilling on an ongoing basis for the entire duration of the project. Scope of work included extensive road sawing, core drilling and wire sawing.

As the preferred subcontractor selected by Leighton Contractors, Online Concrete Cutting Services were engaged to perform a large quantity of concrete sawing and core drilling on an ongoing basis for the entire duration of the project. Scope of work included extensive road sawing, core drilling and wire sawing. Multiple crews (often exceeding eight operators) were active performing work day and night. A critical aspect on this project was the use of self sufficient operator vehicles (including power and water on-board).